How the model works
The ship is divided into bays, rows and tiers on deck and in the hold; the bow and stern bays have fewer rows and tiers. On arrival the stacks are filled at random to the given share.
Containers for one port are stowed together, so whole bays are discharged from the top down. Loading fills free slots from the bottom up; the hold only when the bay's deck is empty.
Each bay is worked in the standard sequence: discharge the deck, remove the hatch covers, discharge and load the hold, replace the covers, load the deck.
Bays are split between the cranes into contiguous zones with the smallest maximum workload. Cranes never come closer than the given distance; waiting for a neighbour is counted as interference.
Several identical ships can lie at the quay. A crane is plugged into a power pit in the middle of its zone and travels no further from it than the cable length. A crane's zone may extend onto the neighbouring ship; when a crane has finished its own bays, it takes the last bay of its left neighbour if the cable reaches it.
The cycle time is the trolley travel to the row, hoisting to the slot and to the truck, and positioning with lock / unlock; random variation and the wait for transport are added to it.
Results are averaged over the replications: berth and crane productivity (gross over the ship's time at berth, net over the crane's working time) and crane utilization.